Boulder Creek
Client: BC Hydro
To supply and place 1200 tonnes of riprap to raise the bottom invert
of the creek to ensure the water would be supplied to a diversion
pipe.

Seymour River Bank Protection Works Client:
Squamish Nation
Construction of approximately 4,200 m3 of
riprap bank protection, bendway spurs,
biotechnical riparian enhancement, riparian restoration, and
in-stream works.
 
North Creek Stormwater Diversion
Client: The Township of Langley
Installation of twin 1350mm steel drainage culverts, construct
lock-block headwalls, channel and ditch re-grading, re-locate an
existing gas main, local fill and grading, and supply and installation
of a short section of 450mm storm sewer.

Byrne Creek - 17th Avenue Headwall Construction
Client: City of Burnaby
The construction of a headwall and associated works for the upstream end
of the culvert that conveys Byrne Creek under 17th Avenue in the City of
Burnaby.
|
 |