Boulder Creek
Client:
BC Hydro

To supply and place 1200 tonnes of riprap to raise the bottom invert of the creek to ensure the water would be supplied to a diversion pipe.

Seymour River Bank Protection Works
Client:
Squamish Nation

Construction of approximately 4,200 m3 of riprap bank protection,    bendway spurs, biotechnical riparian enhancement, riparian restoration, and in-stream works.         

North Creek Stormwater Diversion
Client:
The Township of Langley

Installation of twin 1350mm steel drainage culverts, construct lock-block headwalls, channel and ditch re-grading, re-locate an existing gas main, local fill and grading, and supply and installation of a short section of 450mm storm sewer.

Byrne Creek - 17th Avenue Headwall Construction
Client:
City of Burnaby

The construction of a headwall and associated works for the upstream end of the culvert that conveys Byrne Creek under 17th Avenue in the City of Burnaby.